The Challenge
When the Bank decided to expand their NYC offices to two new uptown locations, TRITECH was selected to provide IT infrastructure. A massive, multi-million-dollar undertaking, the project utilizes a phased approach to construction and is scheduled for completion in late summer 2021. As would be expected in a project of this magnitude, timely product availability, careful coordination and intricate scheduling are required to successfully complete each phase as the project moves through to completion.
The Solutions
Utilizing over 2,000,000 feet of copper and fiber cabling, distributed across dozens of floors in two separate buildings, TRITECH designed and implemented integrated security and IT solutions that provide flexible and robust systems for the bank’s needs. These systems include nearly 8,000 data drops, more than 1,200 occupancy sensors, intercoms, WAPs and other infrastructure products. TRITECH also provided Sound Masking systems that include more than 1,500 speakers distributed over the entire space. TRITECH engineers and technicians have developed detailed documentation of all the systems installed to ensure that any service or modification requirements in the future can be easily implemented.
The Outcome
TRITECH systems installed in the new facilities will continue the Bank’s tradition of providing a secure and flexible working environment for their employees, clients and visitors.